Challenges Faced While Preparing Shop Drawing
Shop Drawing involves people of
different disciplines right from structural engineer, architect to fabricators,
steel detailers as well as erection team. Every participant holds a different
view for the uses of shop drawing and shares the liabilities in the process.
The shop drawing review procedure generally involves the examination of the
participants performing different actions.
The fabricator observes closely each
and every action related to the steel work for deciding further proceeding with
shop drawings. The EOR or the architect might approve, ask for resubmission and
revision or totally reject the drawings after getting it reviewed.
Challenges
while preparing the prevision drawings
Major challenges during the process
of preparing precision drawing:
- Structural member is
missing in the plan or the elevation
- Incomplete documents
of the contract
- Particular details of
the project are not furnished
- Structural drawing is
not matched with the architectural or mechanical drawings
- Specifications and
design drawing do not agree
- Structural dimensions
don’t close in drawings
- Connection or
sequencing needs are not fulfilled
- Noncompliance with
the codes of the industry for developing the drawings
Recommendations
for enhancing the process of structural drawing
- Complete documents of
contract are needed
- Architects and
engineers should know about the standards of the industry
- Specs should be
supplied with bid drawings
- Bid drawing should be
matched with design drawing
- Complete details have
to be offered
- The magnitude and
position of the uncommon loads have to be supplied to the joist provider
- EOR should comply as
well as use AISC Coding as and when required